Monitoring Plan
Monitoring Plans for this methodology shall include, but are not limited to, tracking of the following information by Project Developers:
Transportation distances for the collection of waste batteries until the project's site.
Type and chemistry of collected batteries (Battery A).
Percentage of recycled battery packs, auxiliary components, BMS, and BUs derived from the collected battery packs (Battery A).
The quantity, type, and weight of second-life batteries sold (Battery B) in a functional state, along with their respective State of Health (SoH) and lifespan (optional). If lifespan data is unavailable, conservative assumptions will be made.
Quantity and type of new materials used in the second life battery, as well as any new electrolyte solutions incorporated into the sold battery (Battery B).
See Table 2 in the section Data Sources for more details.
The Project Developer is the party responsible for adhering to the Monitoring Plan.
Last updated