LogoLogo
RegistryBack to websiteSubmit a feedback
  • Riverse Documentation Home
  • Riverse Standard Documents
    • Riverse Standard Rules
      • Organization of Riverse
      • Riverse Carbon Credits
      • Certification procedures
      • General eligibility criteria
      • GHG quantification
      • Appendix
      • Version history
    • Riverse Procedures Manual
      • Teams and stakeholders
      • Standard Documentation & methodologies management
      • Project certification procedure
      • RCC management, avoiding over crediting
      • Procedures for VVBs
      • Conflict of Interest policy
      • Version history
    • Double counting policy
    • Requirements for Validation and Verification Bodies (VVBs)
      • VVB accreditation & oversight
      • Validation process
      • Verification process
    • Procedural templates
      • Methodology creation proposal template
      • Project Design Document template
      • Additionality evaluation template
      • Site registration template
      • Stakeholder consultation letter
      • Annual monitoring template
      • Letter of Authorization Article 6/CORSIA
      • Letter of delegation for registration partner
    • Public consultations
  • Methodologies
    • Biomass carbon removal and storage (BiCRS)
      • BiCRS methodology
      • Carbon capture modules
        • Biomass feedstock
        • Biogenic CO2 flue gas (coming soon)
      • Transformation modules
        • Processing and energy use
        • Energy co-products
        • Infrastructure and machinery
        • Transportation
      • Carbon storage modules
        • Biochar application to soils
        • Biochar storage in concrete (coming soon)
    • Biogas from anaerobic digestion
      • Introduction
      • Eligible technologies
      • Eligibility criteria
      • GHG quantification
      • Monitoring plan
      • Circularity Assessment
      • Version history
      • Appendix
      • Risk evaluation template
    • Refurbishing of electronic devices
      • Introduction
      • Eligible technologies
      • Eligibility criteria
      • GHG quantification
      • Monitoring Plan
      • Circularity Assessment
      • Version history
      • Appendix
      • Risk evaluation template
    • Biobased construction materials
      • Introduction
      • Eligible technologies
      • Eligibility criteria
      • GHG quantification
      • Monitoring plan
      • Version history
      • Risk evaluation template
    • Battery second life
      • Introduction
      • Eligible technologies
      • Eligibility criteria
      • GHG quantification
      • Monitoring Plan
      • Circularity assessment
      • Version history
      • Appendix
      • Risk evaluation template
    • Archived documents
      • Archived BiCRS methodology
      • Archived Biobased construction methodology
      • Archived Biogas from anaerobic digestion methodology
      • Archived Refurbishing of electronic devices methodology
      • Archived Riverse Standard Documents
  • Glossary
  • Accronyms
  • Other
    • Conflict of Interest (COI) policy
    • Complaints and Appeals Policy
    • Terms & contracts
      • Terms of Reference - SAB
      • Terms of Reference - TAC
      • KYC Policy
      • Anti-Bribery and Corruption Policy
      • Riverse Standard and Registry Fees
      • Terms & Conditions for Project Developers (MRV + Registry)
      • Terms & Conditions for Registry users
      • Privacy policy
    • Administrative oversight
Powered by GitBook

Riverse SAS

On this page
Export as PDF
  1. Methodologies
  2. Biogas from anaerobic digestion

Monitoring plan

Monitoring Plans for this methodology shall include at a minimum, but are not limited to, tracking of the following information:

  • amount of biomethane injected into the grid

  • mass and waste status of each feedstock input in tonnes of fresh matter (ensuring the dedicated crop and ILUC risk thresholds are not surpassed, see Environmental and Social Do No Harm and Leakage)

  • repartition of solid, liquid and raw digestate

  • amount and type of electricity use on-site

  • description of any major changes in operations

The Project Developer is the party responsible for adhering to the Monitoring Plan.

PreviousGHG quantificationNextCircularity Assessment

Last updated 6 months ago