LogoLogo
RegistryBack to websiteSubmit a feedback
  • Riverse Documentation Home
  • Riverse Standard Documents
    • Riverse Standard Rules
      • Organization of Riverse
      • Riverse Carbon Credits
      • Certification procedures
      • General eligibility criteria
      • GHG quantification
      • Appendix
      • Version history
    • Riverse Procedures Manual
      • Teams and stakeholders
      • Standard Documentation & methodologies management
      • Project certification procedure
      • RCC management, avoiding over crediting
      • Procedures for VVBs
      • Conflict of Interest policy
      • Version history
    • Double counting policy
    • Requirements for Validation and Verification Bodies (VVBs)
      • VVB accreditation & oversight
      • Validation process
      • Verification process
    • Procedural templates
      • Methodology creation proposal template
      • Project Design Document template
      • Additionality evaluation template
      • Site registration template
      • Stakeholder consultation letter
      • Annual monitoring template
      • Letter of Authorization Article 6/CORSIA
      • Letter of delegation for registration partner
    • Public consultations
  • Methodologies
    • Biomass carbon removal and storage (BiCRS)
      • BiCRS methodology
      • Carbon capture modules
        • Biomass feedstock
        • Biogenic CO2 flue gas (coming soon)
      • Transformation modules
        • Processing and energy use
        • Energy co-products
        • Infrastructure and machinery
        • Transportation
      • Carbon storage modules
        • Biochar application to soils
        • Biochar storage in concrete (coming soon)
    • Biogas from anaerobic digestion
      • Introduction
      • Eligible technologies
      • Eligibility criteria
      • GHG quantification
      • Monitoring plan
      • Circularity Assessment
      • Version history
      • Appendix
      • Risk evaluation template
    • Refurbishing of electronic devices
      • Introduction
      • Eligible technologies
      • Eligibility criteria
      • GHG quantification
      • Monitoring Plan
      • Circularity Assessment
      • Version history
      • Appendix
      • Risk evaluation template
    • Biobased construction materials
      • Introduction
      • Eligible technologies
      • Eligibility criteria
      • GHG quantification
      • Monitoring plan
      • Version history
      • Risk evaluation template
    • Battery second life
      • Introduction
      • Eligible technologies
      • Eligibility criteria
      • GHG quantification
      • Monitoring Plan
      • Circularity assessment
      • Version history
      • Appendix
      • Risk evaluation template
    • Archived documents
      • Archived BiCRS methodology
      • Archived Biobased construction methodology
      • Archived Biogas from anaerobic digestion methodology
      • Archived Refurbishing of electronic devices methodology
      • Archived Riverse Standard Documents
  • Glossary
  • Accronyms
  • Other
    • Conflict of Interest (COI) policy
    • Complaints and Appeals Policy
    • Terms & contracts
      • Terms of Reference - SAB
      • Terms of Reference - TAC
      • KYC Policy
      • Anti-Bribery and Corruption Policy
      • Riverse Standard and Registry Fees
      • Terms & Conditions for Project Developers (MRV + Registry)
      • Terms & Conditions for Registry users
      • Privacy policy
    • Administrative oversight
Powered by GitBook

Riverse SAS

On this page
Export as PDF
  1. Methodologies
  2. Biobased construction materials

Version history

Description of the change
Justification
Date
Version changed

Short term removal credits (50-100 years) no longer an option

Short term removals have limited value in offsetting GHG emissions

23/10/2023

V1.0 to V1.1

Added equations for calculation GHG reductions

Increased transparency

29/01/2024

V1.1 to V2.0

Specified that building developers are eligible for carbon credits based on their use of biobased materials in their constructions

Expanding the scope to include other types of actors that are decisive in the sector

29/01/2024

V1.1 to V2.0

Aligned terminology with ISO 14064-2:2019

Improved consistency with the voluntary carbon market

29/01/2024

V1.1 to V2.0

Added risk assessment template for permanence and environmental and social do no harm

Provide more detailed and prescriptive assessment framework, clearer instructions for project developers

29/01/2024

V1.1 to V2.0

Removed text for sections that are the same for all methodologies:

  • Measurability

  • Real

  • Additionality

  • Technology readiness level

  • Minimum impact

  • Independently verified

Repeated text from the Standard Rules

29/01/2024

V1.1 to V2.0

Distinction between reference service lifetime (RSL) and carbon storage duration (CSD)

Two lifetimes must be differentiated for two purposes: CSD for permanence criteria, and RSL for GHG reduction calculations/substitution criteria

29/01/2024

V1.1 to V2.0

Added Monitoring Plan section

Alignment with Riverse Standard Rules V6

13/03/2024

V2.0 (PC) to V2.0

Remove mentions of Rebound Effect and Independently Validated criteria

Alignment with Riverse Standard Rules V6

13/03/2024

V2.0 (PC) to V2.0

Added uncertainty section

Alignment with Riverse Standard Rules V6

13/03/2024

V2.0 (PC) to V2.0

Modifications in calculation approach:

  • No longer subtract biogenic carbon from Module A for avoidance calculations

  • Removals now have emissions from Modules A1-A3 subtracted from removals

More clearly and accurately represent avoided vs removed GHG emissions.

13/03/2024

V2.0 (PC) to V2.0

Renamed provision pool to buffer pool, and uncertainty buffer to discount factor.

Alignment with Riverse Standard Rules V6 post public consultation.

17/5/2024

V2.0 to V2.1

Recommended discount factor changed from 10% to 6%.

Alignment with Riverse Standard Rules V6 post public consultation.

17/5/2024

V2.0 to V2.1

Clarify that ancillary material emissions/removals are not considered in project removals, and distinguish between project biobased material and project scenario.

Clarification of the previous text’s intent.

August 2024

V2.1 to V2.2

Expanded description of guidelines for selecting baseline scenario plus examples

Transparency and documentation of our current practice

October 2024

V2.2 to V2.3

Added Project Scenario section

Consistent structure with other methodologies, exhaustive

October 2024

V2.2 to V2.3

Create project scope requirements

Specify that operations in different countries must be registered as separate projects

October 2024

V2.2 to V2.3

Add minimum list of ESDNH risks

Align with Standard Rules V6.2

October 2024

V2.2 to V2.3

Specify minimum frequency of updating baseline scenario

Clarity and transparency

October 2024

V2.2 to V2.3

PreviousMonitoring planNextRisk evaluation template

Last updated 6 months ago