LogoLogo
RegistryBack to websiteSubmit a feedback
  • Riverse Documentation Home
  • Riverse Standard Documents
    • Riverse Standard Rules
      • Organization of Riverse
      • Riverse Carbon Credits
      • Certification procedures
      • General eligibility criteria
      • GHG quantification
      • Appendix
      • Version history
    • Riverse Procedures Manual
      • Teams and stakeholders
      • Standard Documentation & methodologies management
      • Project certification procedure
      • RCC management, avoiding over crediting
      • Procedures for VVBs
      • Conflict of Interest policy
      • Version history
    • Double counting policy
    • Requirements for Validation and Verification Bodies (VVBs)
      • VVB accreditation & oversight
      • Validation process
      • Verification process
    • Procedural templates
      • Methodology creation proposal template
      • Project Design Document template
      • Additionality evaluation template
      • Site registration template
      • Stakeholder consultation letter
      • Annual monitoring template
      • Letter of Authorization Article 6/CORSIA
      • Letter of delegation for registration partner
    • Public consultations
  • Methodologies
    • Biomass carbon removal and storage (BiCRS)
      • BiCRS methodology
      • Carbon capture modules
        • Biomass feedstock
        • Biogenic CO2 flue gas (coming soon)
      • Transformation modules
        • Processing and energy use
        • Energy co-products
        • Infrastructure and machinery
        • Transportation
      • Carbon storage modules
        • Biochar application to soils
        • Biochar storage in concrete (coming soon)
    • Biogas from anaerobic digestion
      • Introduction
      • Eligible technologies
      • Eligibility criteria
      • GHG quantification
      • Monitoring plan
      • Circularity Assessment
      • Version history
      • Appendix
      • Risk evaluation template
    • Refurbishing of electronic devices
      • Introduction
      • Eligible technologies
      • Eligibility criteria
      • GHG quantification
      • Monitoring Plan
      • Circularity Assessment
      • Version history
      • Appendix
      • Risk evaluation template
    • Biobased construction materials
      • Introduction
      • Eligible technologies
      • Eligibility criteria
      • GHG quantification
      • Monitoring plan
      • Version history
      • Risk evaluation template
    • Battery second life
      • Introduction
      • Eligible technologies
      • Eligibility criteria
      • GHG quantification
      • Monitoring Plan
      • Circularity assessment
      • Version history
      • Appendix
      • Risk evaluation template
    • Archived documents
      • Archived BiCRS methodology
      • Archived Biobased construction methodology
      • Archived Biogas from anaerobic digestion methodology
      • Archived Refurbishing of electronic devices methodology
      • Archived Riverse Standard Documents
  • Glossary
  • Accronyms
  • Other
    • Conflict of Interest (COI) policy
    • Complaints and Appeals Policy
    • Terms & contracts
      • Terms of Reference - SAB
      • Terms of Reference - TAC
      • KYC Policy
      • Anti-Bribery and Corruption Policy
      • Riverse Standard and Registry Fees
      • Terms & Conditions for Project Developers (MRV + Registry)
      • Terms & Conditions for Registry users
      • Privacy policy
    • Administrative oversight
Powered by GitBook

Riverse SAS

On this page
  • Change log for Riverse Standard Rules V6
  • Change log for Riverse Standard Rules V5.2
Export as PDF
  1. Riverse Standard Documents
  2. Riverse Standard Rules

Version history

Version history and changes to the Riverse Standard Rules

PreviousAppendixNextRiverse Procedures Manual

Last updated 7 months ago

See for full versions of previous documents

Change log for Riverse Standard Rules V6.2

Replace V6.1 with V6.2 October 2024

  • Replace PDD and Project Design Document with PDD and Project Design document

  • Revised Additionality Template with new requirements:

    • Sensitivity analysis

    • For barrier analysis, demonstrate alternative activities does not face same barrier

  • Revise ESDNH criteria, minimum risks to consider for all projects

Change log for Riverse Standard Rules V6.1

Replace V6.0 with V6.1 August 2024

  • New appendix with IT Security requirements

  • Terminology changes, reflected in the Glossary (notably discount factor and buffer pool)

Change log for Riverse Standard Rules V6

Change log for Riverse Standard Rules V5.2

👉
Archived Riverse Standard Documents