Replace PDD and Project Design Document with PDD and Project Design document
New ABC policy
Replace some instances of Verification Report with Monitoring Report, harmonized
Create procedures for
Erroneous issuance cancelation
Discontinuing a methodology
Renewing crediting periods
Introduce continuous issuance procedure and eligibility criteria
Publish current Methodology Creation Mandates
Minimum requirements for PDDs
Clarify Project status throughout certification procedure
Change log for Procedures Manual V2.1
Replace V2.0 with V2.1 May 2024
Terminology changes, reflected in the Glossary (notably discount factor and buffer pool). Clearer performance criteria for VVBs, including timeliness, accuracy, and communication metrics. Clarifications regarding compliance with updates to Riverse Standards or methodologies.
Change log for Procedures Manual V2.0
Replace V1.0 with V2.0 February 2024
More detailed/new procedures related to site registration, VVB protocols, site audits (remote and in-person), methodology creation/revision, RCC management section on provision pools, over/under achievement and reversal/cancelation