LogoLogo
RegistryBack to websiteSubmit a feedback
  • Riverse Documentation Home
  • Riverse Standard Documents
    • Riverse Standard Rules
      • Organization of Riverse
      • Riverse Carbon Credits
      • Certification procedures
      • General eligibility criteria
      • GHG quantification
      • Appendix
      • Version history
    • Riverse Procedures Manual
      • Teams and stakeholders
      • Standard Documentation & methodologies management
      • Project certification procedure
      • RCC management, avoiding over crediting
      • Procedures for VVBs
      • Conflict of Interest policy
      • Version history
    • Double counting policy
    • Requirements for Validation and Verification Bodies (VVBs)
      • VVB accreditation & oversight
      • Validation process
      • Verification process
    • Procedural templates
      • Methodology creation proposal template
      • Project Design Document template
      • Additionality evaluation template
      • Site registration template
      • Stakeholder consultation letter
      • Annual monitoring template
      • Letter of Authorization Article 6/CORSIA
      • Letter of delegation for registration partner
    • Public consultations
  • Methodologies
    • Biomass carbon removal and storage (BiCRS)
      • BiCRS methodology
      • Carbon capture modules
        • Biomass feedstock
        • Biogenic CO2 flue gas (coming soon)
      • Transformation modules
        • Processing and energy use
        • Energy co-products
        • Infrastructure and machinery
        • Transportation
      • Carbon storage modules
        • Biochar application to soils
        • Biochar storage in concrete (coming soon)
    • Biogas from anaerobic digestion
      • Introduction
      • Eligible technologies
      • Eligibility criteria
      • GHG quantification
      • Monitoring plan
      • Circularity Assessment
      • Version history
      • Appendix
      • Risk evaluation template
    • Refurbishing of electronic devices
      • Introduction
      • Eligible technologies
      • Eligibility criteria
      • GHG quantification
      • Monitoring Plan
      • Circularity Assessment
      • Version history
      • Appendix
      • Risk evaluation template
    • Biobased construction materials
      • Introduction
      • Eligible technologies
      • Eligibility criteria
      • GHG quantification
      • Monitoring plan
      • Version history
      • Risk evaluation template
    • Battery second life
      • Introduction
      • Eligible technologies
      • Eligibility criteria
      • GHG quantification
      • Monitoring Plan
      • Circularity assessment
      • Version history
      • Appendix
      • Risk evaluation template
    • Archived documents
      • Archived BiCRS methodology
      • Archived Biobased construction methodology
      • Archived Biogas from anaerobic digestion methodology
      • Archived Refurbishing of electronic devices methodology
      • Archived Riverse Standard Documents
  • Glossary
  • Accronyms
  • Other
    • Conflict of Interest (COI) policy
    • Complaints and Appeals Policy
    • Terms & contracts
      • Terms of Reference - SAB
      • Terms of Reference - TAC
      • KYC Policy
      • Anti-Bribery and Corruption Policy
      • Riverse Standard and Registry Fees
      • Terms & Conditions for Project Developers (MRV + Registry)
      • Terms & Conditions for Registry users
      • Privacy policy
    • Administrative oversight
Powered by GitBook

Riverse SAS

On this page
Export as PDF
  1. Riverse Standard Documents
  2. Riverse Procedures Manual

Version history

Version history and changes to the Riverse Procedures Manual

PreviousConflict of Interest policyNextDouble counting policy

Last updated 6 months ago

See for full versions of previous documents

Change log for Procedures Manual V2.2

Replace V2.1 with V2.2 October 2024

  • Replace PDD and Project Design Document with PDD and Project Design document

  • New ABC policy

  • Replace some instances of Verification Report with Monitoring Report, harmonized

  • Create procedures for

    • Erroneous issuance cancelation

    • Discontinuing a methodology

    • Renewing crediting periods

  • Introduce continuous issuance procedure and eligibility criteria

  • Publish current Methodology Creation Mandates

  • Minimum requirements for PDDs

  • Clarify Project status throughout certification procedure

Change log for Procedures Manual V2.1

Replace V2.0 with V2.1 May 2024

Terminology changes, reflected in the Glossary (notably discount factor and buffer pool). Clearer performance criteria for VVBs, including timeliness, accuracy, and communication metrics. Clarifications regarding compliance with updates to Riverse Standards or methodologies.

Change log for Procedures Manual V2.0

Replace V1.0 with V2.0 February 2024

More detailed/new procedures related to site registration, VVB protocols, site audits (remote and in-person), methodology creation/revision, RCC management section on provision pools, over/under achievement and reversal/cancelation

👉
Archived Riverse Standard Documents